Yokohama Administration and Training Facility Study

West Point, MS

Project Description

The project consists of an approximately 30,000sq ft, one story building. The building will be designed and constructed to serve two purposes. First, it will house YTMM’s administrative, management, and engineering personnel. Secondly, it will double as a training facility to host training sessions.

YTMM envisions the building having a front façade fitting of a manufacturing center being constructed to support the North American Market. This building will be the location where guests are welcomed onto the campus. It will also sit between two plants and thus should have presence and not be dwarfed by the manufacturing plants on either side. The sides and rear of the building can be less architecturally significant since they will not be directly visible